Edward J. Jaselskis
págs. 215-216
Partnering Mechanism in Construction: An Empirical Study on the Chinese Construction Industry
David M. Young, Colin F. Duffield, Wenzhe Tang
págs. 217-229
Comparing Procurement Methods for Design-Build Projects
Marwa A. El Wardani, Michael J. Horman, John I. Messner
págs. 230-238
Andreas Wibowo
págs. 239-248
págs. 249-258
Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints
Heng Li, Hong Zhang, C. M. Tam
págs. 259-267
Automated Statistical Analysis in Stochastic Project Scheduling Simulation
David Arditi, Dong-Eun Lee
págs. 268-277
R. Soetanto, J. Glass, A. D. F. Price, A. R. J. Dainty
págs. 278-290
Yasser Mohamed, Simaan AbouRizk, Albert Agbulos, John Roesch, Mohamed Al-Hussein
págs. 291-299
págs. 300-313
págs. 314-320
Analysis of Construction Worker Injuries That Do Not Result in Lost Time
Geneva Giang, Jimmie Hinze, Jenny N. Devenport
págs. 321-326
Zhen Chen, Heng Li
págs. 327-328
© 2001-2024 Fundación Dialnet · Todos los derechos reservados