pág. 5
págs. 6-8
pág. 6
Papp Laszlo Sportarena, Budapest
A. Peczely
págs. 9-10
S. Pinter
págs. 11-14
págs. 15-17
Millennium Cultural Centre, Budapest
Z. Bencze, G. Liptovszky, G. Kadar
págs. 18-20
Electrolysis-Hall, Borsodchem, Kazincbarcika
K. Fazekas, A. Reicher, J. Visontai
págs. 21-23
Reconstruction of an Office Building, Roosevelt Square, Budapest
B. Nemes, J. Almasi
págs. 24-27
Korong Prestressed Extradosed Bridge
J. Barta, J. Becze
págs. 28-30
págs. 31-35
L. Matyassy, M. Palossy
págs. 36-38
Dynamic Testing and Modeling of a 30-years' old Cable-Stayed Bridge
A. Gennari-Santori, C. Gentile
págs. 39-43
Assessment of Damaged Post-Tensioning Tendons
E. M. Eichinger, M. Vill
págs. 44-48
Experimental Study of a Launching Gantry Reduced Scale Model strengthened with Organic Prestressing
A. A. da Fonseca, P. A. R. Pacheco, A. C. G. M. Andre
págs. 49-52
págs. 53-58
Numerical Model for Crack Width Calculation in Concrete Elements
J. Radnic, A. Harapin, L. Markota
págs. 59-65
J. Thomas, A. Ramaswamy
págs. 66-73
H. F. Xiang
págs. 74-77
© 2001-2024 Fundación Dialnet · Todos los derechos reservados