Edward J. Jaselskis
págs. 433-434
págs. 435-443
MAUT-Based Dispute Resolution Selection Model Prototype for International Construction Projects
Charles K. L. Chan, Edwin H W Chan, Henry C. H. Suen
págs. 444-451
SangHyun Lee, Feniosky Peña-Mora, Moonseo Park
págs. 452-464
Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study
John T. Harvey, Hojung Lee, Eul-Bum Lee
págs. 465-472
Graham M. Winch, Steve North
págs. 473-481
J. Uma Maheswari, T. Sridharan, Koshy Varghese
págs. 482-490
Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects
Amr Kandil, Khaled El Rayes
págs. 491-498
Firm Performance and Information Technology Utilization in the Construction Industry
Mohammad El-Mashaleh, William J. O¿Brien, R. Edward Minchin
págs. 499-507
Using GPS to Measure the Impact of Construction Activities on Rural Interstates
Dulcy M. Abraham, Camilo Garcia, Darcy M. Bullock, Ryan Huebschman
págs. 508-515
Prototype System for Knowledge Problem Definition
John M. Kamara, Ahmed M. Al-Ghassani, Patricia M. Carrillo, Chimay J. Anumba
págs. 516-524
Motivational Climate of Construction Apprentice
Benjamin Obinero Uwakweh
págs. 525-532
Comparative Injury and Fatality Risk Analysis of Building Trades
Selim Baradan, Mumtaz A. Usmen
págs. 533-539
págs. 540-541
Edmond Miresco, Adel Francis
págs. 542-543
págs. 543-545
Closure to ¿Critical Path Method with Multiple Calendars¿ by Kyunghwan Kim and Jesús M. de la Garza
Jesús M. de la Garza, Kyunghwan Kim
pág. 543
págs. 545-547
© 2001-2024 Fundación Dialnet · Todos los derechos reservados