Erratum to: Speed optimization control method of smooth motion for high-speed CNC machine tools.
L. Wang, J. Cao, Y. Li
págs. 327-328
An investigation of vendor-managed inventory application in supply chain: the EOQ model with shortage.
S.H.R. Pasandideh, Seyed Taghi Akhavan Niaki, A. Roozbeh Nia
págs. 329-340
Optimal ordering and pricing policies for deteriorating items in one-vendor multi-retailer supply chain.
T.-H. Chen, H.-M. Chang
págs. 341-356
Applying regression analysis to improve dyeing process quality: a case study.
C.-C. Kuo, S. Pietras
págs. 357-368
An available-to-promise model considering customer priority and variance of penalty costs.
H. Jung
págs. 369-378
Multi-item supplier selection and lot-sizing planning under multiple price discounts using augmented e-constraint and Tchebycheff method.
J. Razmi, E. Maghool
págs. 379-392
A software system to support the development and maintenance of complex product configurators.
A. Haug
págs. 393-406
Barrier analysis for product service system using interpretive structural model.
T.C. Kuo, H.-Y. Ma, S.H. Huang, A.H. Hu, C. S. Huang
págs. 407-417
© 2001-2024 Fundación Dialnet · Todos los derechos reservados
Coordinado por: