Deriving the cost function for a class of three-echelon inventory system with N-retailers and one-for-one ordering policy.
M. Hajiaghaei-keshteli, S.M. Sajadifar
págs. 343-352
A parallel complete anytime procedure for project scheduling under multiple resource constraints.
R. Zamani
págs. 353-362
Erratum to: A parallel complete anytime procedure for project scheduling under multiple resource constraints.
págs. 363-364
Single-machine-based production scheduling model integrated preventive maintenance planning.
E. Pan, W. Liao, L. Xi
págs. 365-376
Online intelligent monitoring and diagnosis of aircraft horizontal stabilizer assemble processes.
S. Du, L. Xi, J. Yu, J. Sun
págs. 377-390
A robust optimization model for p-median problem with uncertain edge lengths.
M.E. Nikoofal, S.J. Sadjadi
págs. 391-398
Design and experimental study of an end effector for robotic drilling.
J. Liang, S. Bi
págs. 399-408
Geometric data simplification for a virtual factory.
J.-G. Kwak, S.C. Park, M. Chang
págs. 409-418
Erratum to: Genetic-algorithm-based multi-objective optimization of the build orientation in stereolithography.
V. Canellidis, J. Giannatsis, V. Dedoussis
pág. 419
© 2001-2024 Fundación Dialnet · Todos los derechos reservados
Coordinado por: