págs. 1-30
A robust optimization approach for the unrelated parallel machine scheduling problem
Jonathan De La Vega, Alfredo Moreno, Reinaldo Morabito, Pedro Munari
págs. 31-66
págs. 67-109
págs. 110-138
págs. 139-164
Analysis of the selective traveling salesman problem with time‑dependent profts
Eva Barrena, José David Canca Ortiz, Leandro C. Coelho, Gilbert Laporte
págs. 165-193
Multi‑project scheduling problem under shared multi‑skill resource constraints
Meya Haroune, Cheikh Dhib, Emmanuel Neron, Ameur Soukhal, Hafed Mohamed Babou, Mohamedade Farouk Nanne
págs. 194-235
Impact analysis of fexibility on the integrated lot sizing and supplier selection problem
Gabriel de Souza Amaro, Diego Jacinto Fiorotto, Washington Alves de Oliveira
págs. 236-266
© 2001-2024 Fundación Dialnet · Todos los derechos reservados