Flexible Work Breakdown Structure for Integrated Cost and Schedule Control
Youngsoo Jung, Sungkwon Woo
págs. 616-625
Reliability Buffering for Construction Projects
Feniosky Peña-Mora, Moonseo Park
págs. 626-637
Planning and Scheduling Highway Construction
A. Hassanein, O. Moselhi
págs. 638-646
Accuracy of Highway Contractor¿s Schedules
Kris G. Mattila, Michael R. Bowman
págs. 647-655
Constructability Practices among Construction Contractors in Indonesia
Bambang Trigunarsyah
págs. 656-669
págs. 670-679
Owner¿Contractor Work Structures: Process Approach
Shekhar S. Patil, G. Edward Gibson, George R. Sullivan, Stuart D. Anderson
págs. 680-690
Chee Hong Wong
págs. 691-698
Management of Radon in Tunnel Drilling
Andy T. Chan, Keith Y. K. Li
págs. 699-707
Production Process for Manufactured Housing
M. G. Syal, M. Hastak, O. Senghore, T. S. Abdelhamid, A. AbuHammad
págs. 708-718
Analysis of the United States Department of Transportation Prompt Pay Provisions
Metin Atgun, Ali Touran, Ittiphol Bhurisith
págs. 719-725
Impact of Change Orders on Small Labor-Intensive Projects
Awad S. Hanna, Murat Gunduz
págs. 726-733
United Kingdom Construction Claims: Views of Professionals
Steve Scott, Richard Anthony Harris
págs. 734-741
Jingru Li, Lingguang Song, Denghua Zhong, Huirong Zhu
págs. 742-750
Construction Engineering Management Educators: History and Deteriorating Community
James E. Diekmann, Paul S. Chinowsky
págs. 751-758
© 2001-2024 Fundación Dialnet · Todos los derechos reservados