As part of the Bond Street Station Upgrade for London Underground, engineers from Dr. Sauer and Partners performed 3D numerical analyses ahead of the main tunnelling works using Abaqus fi nite-element analysis software from Dassault Systèmes. 3D modelling and simulation of the major construction sequences of excavation and lining installation gave engineers valuable insights into the eff ects of the work at each stage of the project.
© 2001-2024 Fundación Dialnet · Todos los derechos reservados