The new TALEX extrusión plant in Abu Dhabi operates by processing its own extrusión scrap to produce billets. The casthouse, which started operating in February 2016 was built as a turnkey plant by Hertwich Engineering. Annual current capacity is 36,000 tons and after implementation of the second phase, the anual output will be increased up to 45,000 tons of extrusión billets.
© 2001-2024 Fundación Dialnet · Todos los derechos reservados