Santiago, Chile
Purpose – The purpose of this paper is to investigate a control strategy to fulfill low-voltage ride through (LVRT) requirements in wind energy conversion system (WECS).
Design/methodology/approach – This paper considers an active front-end converter of a grid connected WECS working under grid fault conditions. Two strategies based on symmetrical components are studied and proposed: the first one considers control only for positive sequence control (PSC); the second one considered a dual controller for positive and negative sequence controller (PNSC). The performance of each strategy is studied on LVRT requirements fulfillment.
Findings – This paper shows presents a control strategy based on symmetrical component to keep the operation of grid-connected WECS under unsymmetrical grid fault conditions.
Research limitations/implications – This work is being applied to a 2 kVA laboratory prototype. The lab prototype emulates a grid connected WECS.
Originality/value – This paper validate the PNSC strategy to LVRT requirements fulfillment by experimental results obtained for a 2 kVA laboratory prototype. PNSC strategy allows constant active power delivery through grid-voltage dips. In addition, the proposed strategy is able to grid-voltage support by injection of reactive power. Additional features are incorporated to PNSC: sequence separation method using delay signal cancellation and grid frequency identification using phase locked loop.
© 2001-2024 Fundación Dialnet · Todos los derechos reservados