Ayuda
Ir al contenido

Dialnet


Solving stochastic multi-manned U-shaped assembly line balancing problem using differential evolution algorithm

    1. [1] Cairo University

      Cairo University

      Egipto

  • Localización: International Journal of Production Management and Engineering (IJPME), ISSN-e 2340-4876, ISSN 2340-5317, Vol. 10, Nº. 1, 2022, págs. 13-22
  • Idioma: inglés
  • Enlaces
  • Resumen
    • The U-shaped assembly lines help to have more flexibility than the straight assembly lines, where the operators can perform tasks in both sides of the line, the entrance and the exit sides. Having more than one operator in any station of the line can reduce the line length and thereby affects the number of produced products. This paper combines the U-shaped assembly line balancing problem with the multi-manned assembly line balancing problem in one problem. In addition, the processing times of the tasks are considered as stochastic, where they are represented as random variables with known means and variances. The problem is formulated as a mixed-integer linear programming and the cycle time constraints are formulated as chance-constraints. The proposed algorithm for solving the problem is a differential evolution algorithm. The parameter of the algorithm is optimized using experimental design and the computational results are done on 71 adapted problems selected from well-known benchmarks.


Fundación Dialnet

Dialnet Plus

  • Más información sobre Dialnet Plus

Opciones de compartir

Opciones de entorno