Ayuda
Ir al contenido

Dialnet


Resumen de Performance of Bounded DynamicProgramming Applied to a Variantof the MMSP-W Problem

Joaquín Bautista Valhondo, Alberto Cano Merino, Rocío Alfaro Ramos

  • In this study we present a formulation for the MMSP-W (Mixed Model Sequencing Problem with Work overload Minimization) for productions lines with both serial workstations and rules for interrupting operations. We propose a combination of the models M5 and M6 proposed by Bautista and Cano (Eur J OperRes 210:495–513, 2011) and analyze the results obtained, using the BDP (Bounded Dynamic Programming), through a case study of the powertrain line of the Nissan plant in Barcelona.


Fundación Dialnet

Dialnet Plus

  • Más información sobre Dialnet Plus