Periodo de publicación recogido
|
|
|
A new heuristic for minimizing total completion time objective in permutation flow shop scheduling.
D. Laha, A. Chakravorty
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 53, Nº. 9-12, 2011, págs. 1189-1198
A constructive heuristic for minimizing makespan in no-wait flow shop scheduling.
D. Laha, U.K. Chakraborty
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 41, Nº. 1-2, 2009, págs. 97-109
An efficient hybrid heuristic for makespan minimization in permutation flow shop scheduling.
D. Laha, U.K. Chakraborty
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 44, Nº. 5-6, 2009, págs. 559-569
An efficient heuristic approach to total flowtime minimization in permutation flowshop scheduling.
D. Laha, U.K. Chakraborty
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 38, Nº. 9-10, 2008, págs. 1018-1025
Esta página recoge referencias bibliográficas de materiales disponibles en los fondos de las Bibliotecas que participan en Dialnet. En ningún caso se trata de una página que recoja la producción bibliográfica de un autor de manera exhaustiva. Nos gustaría que los datos aparecieran de la manera más correcta posible, de manera que si detecta algún error en la información que facilitamos, puede hacernos llegar su Sugerencia / Errata.
© 2001-2024 Fundación Dialnet · Todos los derechos reservados