Periodo de publicación recogido
|
|
|
A genetic algorithm for dynamic facility planning in job shop manufacturing.
C.-L. Yang, S.-P. Chuang, T.-S. Hsu
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 52, Nº. 1-4, 2011, págs. 303-310
S.-P. Chuang, T.-S. Hsu, C.-L. Yang
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 40, Nº. 1-2, 2009, págs. 193-202
Solving a multi-objective overlapping flow-shop scheduling.
R.-H. Huang, C.-L. Yang
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 42, Nº. 9-10, 2009, págs. 955-962
No-wait two-stage multiprocessor flow shop scheduling with unit setup.
R.-H. Huang, C.-L. Yang, Y.-C. Huang
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 44, Nº. 9-10, 2009, págs. 921-927
Enhanced performance of overlap flow-shop scheduling involving reworking and a time buffer.
S.-C. Lee, T.-S. Hsu, S.-P. Chuang, C.-L. Yang
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 39, Nº. 1-2, 2008, págs. 142-150
Ant colony system for job shop scheduling with time windows.
R.-H. Huang, C.-L. Yang
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 39, Nº. 1-2, 2008, págs. 151-157
Esta página recoge referencias bibliográficas de materiales disponibles en los fondos de las Bibliotecas que participan en Dialnet. En ningún caso se trata de una página que recoja la producción bibliográfica de un autor de manera exhaustiva. Nos gustaría que los datos aparecieran de la manera más correcta posible, de manera que si detecta algún error en la información que facilitamos, puede hacernos llegar su Sugerencia / Errata.
© 2001-2025 Fundación Dialnet · Todos los derechos reservados