Periodo de publicación recogido
|
|
|
Seyed Rahmati, M. Zandieh, Mehdi Yazdani
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 64, Nº. 5-8, 2013, págs. 915-932
Bi-objective hybrid flow shop scheduling: a new local search
S. Mousavi, M Mousakhani, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 64, Nº. 5-8, 2013, págs. 933-950
Scheduling part-time and mixed-skilled workers to maximize employee satisfaction
Mohammad Akbari, M. Zandieh, Behrouz Dorri
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 64, Nº. 5-8, 2013, págs. 1017-1027
A simulated annealing/local search to minimize the makespan and total tardiness on a hybrid flowshop
S. Mousavi, M. Zandieh, Mehdi Yazdani
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 64, Nº. 1-4, 2013, págs. 369-388
A. Banisadr, M. Zandieh, Iraj Mahdavi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 65, Nº. 5-8, 2013, págs. 981-989
A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem.
S.H.A. Rahmati, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 58, Nº. 9-12, 2012, págs. 1115-1130
A cross-docking scheduling problem with sub-population multi-objective algorithms.
A. Boloori Arabani, M. Zandieh, S.M.T. Fatemi Ghomi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 58, Nº. 5-8, 2012, págs. 741-762
Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers.
S. Hakimzadeh Abyaneh, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 58, Nº. 1-4, 2012, págs. 309-326
GA and ICA approaches to job rotation scheduling problem: considering employee�s boredom.
A. Ayough, M. Zandieh, H. Farsijani
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 60, Nº. 5-8, 2012, págs. 651-666
V. Kayvanfar, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 62, Nº. 5-8, 2012, págs. 759-774
An Inquiry-Oriented Approach to Span and Linear Independence: the Case of the Magic Carpet Ride Sequence
Megan Wawro, Chris Rasmussen, M. Zandieh, Franklin Sweeney, Cristine Larson
Primus: problems, resources, and issues in mathematics undergraduate studies, ISSN 1051-1970, Vol. 22, Nº. 8, 2012, págs. 577-599
B. Naderi, S.M.T.F. Ghomi, M. Aminnayeri, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 53, Nº. 5-8, 2011, págs. 751-760
Balancing of stochastic U-type assembly lines: an imperialist competitive algorithm.
M. Bagher, M. Zandieh, H. Farsijani
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 54, Nº. 1-4, 2011, págs. 271-286
An efficient bi-objective heuristic for scheduling of hybrid flow shops.
S.M. Mousavi, M. Zandieh, M. Amiri
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 54, Nº. 1-4, 2011, págs. 287-308
Scheduling open shops with parallel machines to minimize total completion time
B. Naderi, S.M.T. Fatemi Ghomi, M. Aminnayeri, M. Zandieh
Journal of computational and applied mathematics, ISSN 0377-0427, Vol. 235, Nº 5, 2011, págs. 1275-1287
Due windows group scheduling using an effective hybrid optimization approach.
J. Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 46, Nº. 5-8, 2010, págs. 721-736
Scheduling the truck holdover recurrent dock cross-dock problem using robust meta-heuristics.
B. Vahdani, R. Soltani, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 46, Nº. 5-8, 2010, págs. 769-784
E. Rashidi, M. Jahandar, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 49, Nº. 9-12, 2010, págs. 1129-1140
A multi-criteria cross-docking scheduling with just-in-time approach.
A.R. Boloori Arabani, S.M.T. Fatemi Ghomi, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 49, Nº. 5-8, 2010, págs. 741-756
Extension of the ELECTRE method for decision-making problems with interval weights and data.
B. Vahdani, A.H.K. Jabbari, V. Roshanaei, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 50, Nº. 5-8, 2010, págs. 793-800
S. Forouharfard, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 51, Nº. 9-12, 2010, págs. 1179-1194
E. Moradi, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 51, Nº. 5-8, 2010, págs. 829-840
An efficient architecture for scheduling flexible job-shop with machine availability constraints.
E. Moradi, S.M.T. Fatemi Ghomi, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 51, Nº. 1-4, 2010, págs. 325-340
B. Naderi, M. Zandieh, V. Roshanaei
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 41, Nº. 11-12, 2009, págs. 1186-1198
Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns.
M. Gholami, M. Zandieh, A. Alem-Tabriz
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 42, Nº. 1-2, 2009, págs. 189-201
M. Zandieh, B. Dorri, A.R. Khamseh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 43, Nº. 7-8, 2009, págs. 767-778
Scheduling sequence-dependent setup time job shops with preventive maintenance.
B. Naderi, M. Zandieh, S.M.T. Fatemi Ghomi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 43, Nº. 1-2, 2009, págs. 170-181
J. Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 44, Nº. 7-8, 2009, págs. 795-808
A robust parameter design for multi-response problems
M. Zandieh, M. Amiri, B. Vahdani, R. Soltani
Journal of computational and applied mathematics, ISSN 0377-0427, Vol. 230, Nº 2, 2009, págs. 463-476
Synchronizing production and air transportation scheduling using mathematical programming models
M. Zandieh, S. Molla-Alizadeh-Zavardehi
Journal of computational and applied mathematics, ISSN 0377-0427, Vol. 230, Nº 2, 2009, págs. 546-558
Esta página recoge referencias bibliográficas de materiales disponibles en los fondos de las Bibliotecas que participan en Dialnet. En ningún caso se trata de una página que recoja la producción bibliográfica de un autor de manera exhaustiva. Nos gustaría que los datos aparecieran de la manera más correcta posible, de manera que si detecta algún error en la información que facilitamos, puede hacernos llegar su Sugerencia / Errata.
© 2001-2024 Fundación Dialnet · Todos los derechos reservados